2 things really. first is how do i know if i have enough pressure to install shower, and secondly when i tee off the hot water cylinder is it best to go up into loft and across or down under floor boards and across. Also shower will be fitted to external wall, if i chisel out runs for pipework can i just plaster over or do i have to insulate pipework before i plaster over
