Hi there.
We moved into a house last year and we believe the family before had a dog that used this hallway as it's own possible toilet. We have tried everything to clean the carpet but the stains just 'wicks' through again. We even paid for a 'professional' to try it and they ended up refunding us lol
It starts to really smell after a few weeks of not shampooing it.
Due to my wife becoming ill shortly after moving in, money is tight so alot of the work is having to be done by me. I'm happy to do this etc.
So, for now, we've decided to lift the carpet up and put down some Hardwearing vinyl offcut with the plan of tiling it when everything, money wise, is back to normal. After buying the offcut they advised us to either screed the floor or lay down plywood to level the floor. Due to the cost and set time of the screed we've decided to go with plywood.
We've lifted up the carpet and it's asbestos tiles (They're not damaged).
I've read online you need at least 6mm ply that's floor graded.
Can i use just ANY 6mm plywood from say B&Q/Wicks?
Also, any advice on what type of adhesive to use to attach the plywood to the asbestos tiles or would you recommend something else?
We moved into a house last year and we believe the family before had a dog that used this hallway as it's own possible toilet. We have tried everything to clean the carpet but the stains just 'wicks' through again. We even paid for a 'professional' to try it and they ended up refunding us lol
It starts to really smell after a few weeks of not shampooing it.
Due to my wife becoming ill shortly after moving in, money is tight so alot of the work is having to be done by me. I'm happy to do this etc.
So, for now, we've decided to lift the carpet up and put down some Hardwearing vinyl offcut with the plan of tiling it when everything, money wise, is back to normal. After buying the offcut they advised us to either screed the floor or lay down plywood to level the floor. Due to the cost and set time of the screed we've decided to go with plywood.
We've lifted up the carpet and it's asbestos tiles (They're not damaged).
I've read online you need at least 6mm ply that's floor graded.
Can i use just ANY 6mm plywood from say B&Q/Wicks?
Also, any advice on what type of adhesive to use to attach the plywood to the asbestos tiles or would you recommend something else?