need to bring a new floor up to the level of an exsting floor,, its a new extension and the new floor slab is approx 80mm lower then the existing,,, the new slab is insulated and as dpc which as been passed off by building controll,,, what i would like to do is put down 3x2 on a bed of sand and cement and fix to new slab,, to get it level then put ply/ chipboard on top,,, is this an acceptable way of going about it will it be ok with BC