Dear All,
I am intersted to know the power requirement on data center:
- Is there any RCD requirement for data centre ? According to IEE wiring 16 Ed & 17 Ed. If someone could also point me the Reg number on the regulation ??.
- How much the max Earth Leakage figure on the Data center ?. Is there any standard, etc that I could look at ?.
- If we are using UPD the bcak up The power, is there still problem with earth leakage. I have been told that there shouldn’t be any earth leakage from the building back to the utility network as most UPS systems act as isolating transformers between the utility and load. Only when UPS systems are in by-pass is there the possibility of earth leakage back to the utility network which should be considered. Is that correct ?
Thank you
Pantaiema
Pantaiema
I am intersted to know the power requirement on data center:
- Is there any RCD requirement for data centre ? According to IEE wiring 16 Ed & 17 Ed. If someone could also point me the Reg number on the regulation ??.
- How much the max Earth Leakage figure on the Data center ?. Is there any standard, etc that I could look at ?.
- If we are using UPD the bcak up The power, is there still problem with earth leakage. I have been told that there shouldn’t be any earth leakage from the building back to the utility network as most UPS systems act as isolating transformers between the utility and load. Only when UPS systems are in by-pass is there the possibility of earth leakage back to the utility network which should be considered. Is that correct ?
Thank you
Pantaiema
Pantaiema