levelling out sub-base for patio

Joined
27 Aug 2015
Messages
54
Reaction score
0
Country
United Kingdom
Hi,
i've got a patio area around 8m wide along the house by 3m long.

I've put in wooden pegs around 1 every meter in every direction and added a 50mm fall from the start of patio near the house to the end of the patio


I've put some type1 MOT there - any tips on how I can level the type1 with the pegs so i get that fall away from the house?


i've read its best to get the fall right with the hardcore, then add 50mm mortar then the 20mm porcelain tiles on top but at the moment still have high and low areas
 
Sponsored Links
Just take it flat as you can, compact it, then fill any dips before compacting again.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top