load shedding

Joined
18 Nov 2005
Messages
136
Reaction score
0
Country
United Kingdom
can someone explain the purpose of load shedding, or point me in the right direction pls
 
I assume you are talking of reducing load?!?

Usually when a supply upgrade will cost too much......?
 
Or are you referring to a computer room type setup, where load shedding is used to maximise the time a UPS will hold up critical equipment, or to reduce the demand on a UPS/Generator setup?
 
Or a large industrial installation, like a steelworks or a car factory?

Or a Generation and Distribution design?
 
afaict load shedding is the practice of automatically disconnecting some load (prefferablly less important load) to precent a worse situation happening (e.g. overcurrent protection tripping, ups batteries going flat or generators stalling).
 
No,

You are all wrong.

Load shedding is the act of turning of the heating when the in-laws come round, this ensures that they don't hang around too long and are less inclinded to return! :lol:
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top