M.S straps puzzled

Joined
9 Mar 2012
Messages
83
Reaction score
1
Location
Lancashire
Country
United Kingdom
hi all
hope someone can clear this up ?
we are part way through our single storey extension and looking at the drawing ive hit a little wall.
it states :-
"bat sph hangers to ridge,ms straps to cp111 at max 2m crs. across new walls & bird mouthed into wall plate."

then further down says :-
"100 x 75 tanalised wallplates strapped to B/wk. at max 900 crs,"

now this drawing isnt revised , its the first drawing we received, and on this drawing we had a brick gable which is now replaced with glazing..

can someone clear up for me are the 900 centres straps from wallplate to block work or is it the 2m centres straps .

ill assume one is for the gable which arent having anymore..

cheers
 
Sponsored Links
cheers woody, i thought this thats why ive posted imbaffled as to what he wants?
so whats the 900 centres then..
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top