I have a concrete toilet waste currenntly coming up 250mm from the back wall of my toilet. Solid slab floor, 60s build. The new closed couple toilet needs the waste coming up more like 60mm from the back wall. At the moment, placing the toilet against the wall has is sitting right over the current hole.
What would i ned to do to move this? Logic says dig down, cut off and fit a couple of 45 or 30 degree of pvc adaptors to bring it in line, but first off, how best to cut it without digging a huge hole, and secondly, i presume this would require an extra rodding point, how to fit that?
Cheers
What would i ned to do to move this? Logic says dig down, cut off and fit a couple of 45 or 30 degree of pvc adaptors to bring it in line, but first off, how best to cut it without digging a huge hole, and secondly, i presume this would require an extra rodding point, how to fit that?