I need to move the WC a metre down the wall, so I can install a 900mm quadrant show in its place.
The existing stack is made from cast iron and I would rather not remove it (due to time).
Looking at the original branch the fall seems alot more then what ive seen from the fittings in Wickes (roughly 1:60 87.5 deg), the old one seems more like 75 deg.
What I was thinking was cutting the existing bend that comes into the bathroom off, attaching a timesaver connector to carry on a metre along in plastic then come back into the bathroom for the new WC connector
Would this be ok? I know i may need to cut it further back, so to ge the correct fall
The existing stack is made from cast iron and I would rather not remove it (due to time).
Looking at the original branch the fall seems alot more then what ive seen from the fittings in Wickes (roughly 1:60 87.5 deg), the old one seems more like 75 deg.
What I was thinking was cutting the existing bend that comes into the bathroom off, attaching a timesaver connector to carry on a metre along in plastic then come back into the bathroom for the new WC connector
Would this be ok? I know i may need to cut it further back, so to ge the correct fall