We're working on our bathroom at the minute, which for some reason has a step down about a 3rd of the way in. The step down is approx 1 1/2".
I've kind of ruled out self levelling compound as we'd need a hell of a lot of it.
Someone has suggested screwing down 1" plywood, then maybe a thinner layer on top of that?
The area we need to raise is about 1700 x 2200.
So far we think we're going to lay down a laminate, but obviously we're concerned that water might get on to the plywood and cause it to rot/swell.
Doe anyone have any tip or advice?
I've kind of ruled out self levelling compound as we'd need a hell of a lot of it.
Someone has suggested screwing down 1" plywood, then maybe a thinner layer on top of that?
The area we need to raise is about 1700 x 2200.
So far we think we're going to lay down a laminate, but obviously we're concerned that water might get on to the plywood and cause it to rot/swell.
Doe anyone have any tip or advice?