Does anyone know if a two year old 'little' house will have thermal insulation in the ceiling between the kitchen and bedroom?
I have today seen the EIC for a house issued by the builders where it states that ALL the circuits are installed by 'method 101' which makes the standard cooker and socket circuit cables undersized.
Would the cables be installed by this method - plonked and covered - in a new-build ?
I have today seen the EIC for a house issued by the builders where it states that ALL the circuits are installed by 'method 101' which makes the standard cooker and socket circuit cables undersized.
Would the cables be installed by this method - plonked and covered - in a new-build ?