Hi Guys,
After a bit of advice please?
I need to lay a new screed about 40mm in depth to raise the current floor level in our porch way (we have moved the front door forward so effectively the outside porch is now our hallway floor!)
Its only about 2m square in area, but the problem is its our only entrance to the house, so cant avoid passing over it to get in and out
Can someone advise if my plan will be ok? Which is to do the floor and cut a sheet of 9mm ply to the rough size of the laid floor and walk over this, with the hope that it will spread the load!
Any thoughts appreciated.
Many thanks
After a bit of advice please?
I need to lay a new screed about 40mm in depth to raise the current floor level in our porch way (we have moved the front door forward so effectively the outside porch is now our hallway floor!)
Its only about 2m square in area, but the problem is its our only entrance to the house, so cant avoid passing over it to get in and out
Can someone advise if my plan will be ok? Which is to do the floor and cut a sheet of 9mm ply to the rough size of the laid floor and walk over this, with the hope that it will spread the load!
Any thoughts appreciated.
Many thanks