So I think I’ve reached the point of no return with a wetroom.
The floor is NoMorePly 22mm TG4 construction board on joists and as well as screwing them down you have to run a line of adhesive along the joists.
I’m just worried that once it’s glued down, there’s no going back (At least I could unscrew if something’s amiss)
On top will be a screed, Aquaguard mat, Warm Up electric UFH then tile and I know all that will mean the same. I’m just nervous.
The guarantee is invalid if you don’t glue it but thought I’d ask for opinions here.
Thanks
The floor is NoMorePly 22mm TG4 construction board on joists and as well as screwing them down you have to run a line of adhesive along the joists.
I’m just worried that once it’s glued down, there’s no going back (At least I could unscrew if something’s amiss)
On top will be a screed, Aquaguard mat, Warm Up electric UFH then tile and I know all that will mean the same. I’m just nervous.
The guarantee is invalid if you don’t glue it but thought I’d ask for opinions here.
Thanks