Oversite to Suspended timber ground floor

Cheers for that. Although I spent about 25yrs on site it was all on civils & r.c. frame flats/offices etc so house construction is a bit of blank spot!
 
Sponsored Links
There wont be a problem with the oversite being lower than adjacent ground levels if the oversite is permeable. Concrete will hold surface water, so is normally required to be higher than adjacent ground
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top