Hi,
I am laying a foundation for a garden wall and am mixing the concrete myself in a mixer. Do I have to fill the entire length of the foundation in one go whilst all the concrete is wet?
If not, should I fill the whole trench in layers or fill to the top of the trench in sections?
Hope that makes sense.
Thanks in advance.
Jon
I am laying a foundation for a garden wall and am mixing the concrete myself in a mixer. Do I have to fill the entire length of the foundation in one go whilst all the concrete is wet?
If not, should I fill the whole trench in layers or fill to the top of the trench in sections?
Hope that makes sense.
Thanks in advance.
Jon