Hi there,
Thank you for reading this.
I had an electrician so some work on my house (same electrician as referenced in my last post).
He hasn't given my any paperwork other than an invoice.
Please can I check if I should have had any other paperwork?
He did the following:
Replaced the Consumer Unit.
Re-wired the kitchen almost completely (he left the cable going from the new consumer unit to the first socket and he left the cable going from the new consumer unit to the first light fixing. Everything else was moved around so he put in all new cables).
He rewired all the downstairs lighting circuit, the landing lights upstairs, the bathroom light upstairs and he added an outside light to this circuit. The last four lights in the lighting circuit he didn't do anything with.
He added a circuit for the mains-connected smoke alarms, connected the first two on the circuit and added and left the cables in situ for the next two in the circuit (still need to plaster).
Many thanks in advance for any information - I feel like I need to know exactly what to ask him for...
Thank you for reading this.
I had an electrician so some work on my house (same electrician as referenced in my last post).
He hasn't given my any paperwork other than an invoice.
Please can I check if I should have had any other paperwork?
He did the following:
Replaced the Consumer Unit.
Re-wired the kitchen almost completely (he left the cable going from the new consumer unit to the first socket and he left the cable going from the new consumer unit to the first light fixing. Everything else was moved around so he put in all new cables).
He rewired all the downstairs lighting circuit, the landing lights upstairs, the bathroom light upstairs and he added an outside light to this circuit. The last four lights in the lighting circuit he didn't do anything with.
He added a circuit for the mains-connected smoke alarms, connected the first two on the circuit and added and left the cables in situ for the next two in the circuit (still need to plaster).
Many thanks in advance for any information - I feel like I need to know exactly what to ask him for...