amateur here (obviously) ..the control unit is fed from a fused/switched spur next to it , is it necessary to switch the flat's mains right off before swapping out the probe lead..or is switching off at the spur and removing its fuse from the carrier adequate before commencing? (fwiw I would feel safer doing the former but is that a bit over the top?)..interested to see what the pros would do. thanks.