Hi Everyone,
I am repointing my Devon old stone house with lime and I have found some of the stones at the top near the roof (not load bearing) are loose. I want to reset these and I know how to mix up the lime mortar but wondering what the mix is for setting? I am using non-hydraulic putty with a bit of hydraulic added (6:1) to speed up setting for the mortar.
Thanks,
Matt
I am repointing my Devon old stone house with lime and I have found some of the stones at the top near the roof (not load bearing) are loose. I want to reset these and I know how to mix up the lime mortar but wondering what the mix is for setting? I am using non-hydraulic putty with a bit of hydraulic added (6:1) to speed up setting for the mortar.
Thanks,
Matt