Hi
Just preparing the ground prior to turfing. Have rotavated and levelled the ground as much as possible. I have a bag of topsoil waiting to go on top of that. My questions are:
1) Do I roll the ground before or after I put down the top soil. I'm expecting the top soil layer to be an inch.
2) How fine do I have to get the existing soil? Can I leave small stones (around inch diameter)?
Thanks for your help.
Sam
Just preparing the ground prior to turfing. Have rotavated and levelled the ground as much as possible. I have a bag of topsoil waiting to go on top of that. My questions are:
1) Do I roll the ground before or after I put down the top soil. I'm expecting the top soil layer to be an inch.
2) How fine do I have to get the existing soil? Can I leave small stones (around inch diameter)?
Thanks for your help.
Sam