I'm filling in some 35 deep x 100 wide channels in the floor where I took out some internal walls and removed the sole plate.
I have just filled the channels with a damp screed mix but because the levels aren't the same on each side, I need to even out the steps with some areas of self levelling compound.
Is there any reason to wait for the screed to harden or dry before doing the self levelling?
Thanks for any replies.
I have just filled the channels with a damp screed mix but because the levels aren't the same on each side, I need to even out the steps with some areas of self levelling compound.
Is there any reason to wait for the screed to harden or dry before doing the self levelling?
Thanks for any replies.