Hello
As above, really.
I've got a small cloakroom with an existing WC and basin, and want to move the toilet and fir a new basin and shower. There isn't a vertical stack (vent) pipe in the room, so my question is:
'Can I tee the shower & basin waste into a 40mm waste then join this to the existing (plastic) soil waste underground?' Moving the toilet will mean that I could make this connection 'upstream' of the new WC location.
If it's relevant, it's on the ground floor and this is concrete.
Many thanks for any advice.
As above, really.
I've got a small cloakroom with an existing WC and basin, and want to move the toilet and fir a new basin and shower. There isn't a vertical stack (vent) pipe in the room, so my question is:
'Can I tee the shower & basin waste into a 40mm waste then join this to the existing (plastic) soil waste underground?' Moving the toilet will mean that I could make this connection 'upstream' of the new WC location.
If it's relevant, it's on the ground floor and this is concrete.
Many thanks for any advice.