I am about to embark on building a lean to
But as part off the job i wish to move my soil stack and tidy up the waste pipes. so i have 1 hole in the roof.
the waste and rain currently run into a hopper then into a "trap" outside this then feeds straight into soil stack line before entering the man hole
My aim is to move and replace the soil stack to where the waste pipe are.( shorter run for toilet waste which due to moving toilet is quite shallow but functional)
Join the wastes into the soil stack.
Is there anything i can do with the rain water as any smell will exit the gutter rather the the top of the stack.
I know this against regs but is it possible to fashion a "u bend"?
But as part off the job i wish to move my soil stack and tidy up the waste pipes. so i have 1 hole in the roof.
the waste and rain currently run into a hopper then into a "trap" outside this then feeds straight into soil stack line before entering the man hole
My aim is to move and replace the soil stack to where the waste pipe are.( shorter run for toilet waste which due to moving toilet is quite shallow but functional)
Join the wastes into the soil stack.
Is there anything i can do with the rain water as any smell will exit the gutter rather the the top of the stack.
I know this against regs but is it possible to fashion a "u bend"?