A
Andrew Haughton
We hope to lay ex sports hall tongue and groove solid beech floor onto a concrete substrate. It is a huge space in an old warehouse with few straight lines but basically a level base. The total area to cover is about 250m2. My concern is how to lay them. Do we put down a dpm even though the floor seems dry year round? Do we use adhesive to bond the boards to the floor or is it better to glue the boards to each other and let the floor float?Should we strap the floor with 2" x 1" or worse still, 2" x 2" timber and nail the boards to that?
Any tips gratefully received.