Hi
I am having new patio put down, sand stone.
There has been Type 1 min 100mm whacked down. The next step I thought was a sand/cement mix mortar that the sandstone is laid onto, on a 1 by 1 basis.
However they are going to do the above, but before the mortar mix goes down, Geo fabrix is going down and sharp sand then whacked down? I've never heard of it being done this way?
I am having new patio put down, sand stone.
There has been Type 1 min 100mm whacked down. The next step I thought was a sand/cement mix mortar that the sandstone is laid onto, on a 1 by 1 basis.
However they are going to do the above, but before the mortar mix goes down, Geo fabrix is going down and sharp sand then whacked down? I've never heard of it being done this way?