Ok been digging a short trench today 400mm deep to bury my 2.5mm SWA in. It has to terminate at a junction box about 600mm up the rear wall of the house.
I have the correct cleats to fix it to the wall but should it have any other protection such as conduit for example?
The wall is south facing so it will be exposed to hot sun over the years (hopefully lol)