I'm in the process of becoming registered and have been looking at existing installations and thinking through the logistics of how work would be carried out.
One example I've looked at is my mother's installation, which is an old type Wylex fuse board which she's wanted upgrading for some time. The installation is PME with 16mm meter tails and what looks like a 4mm or 6mm earth running from cutout to CU.
Obviously the tails need upgrading to 25mm with a CU change, and the main earth to 16mm.
What I'd assumed before I actually looked at the installation was that I'd get the supplier to fit an isolating switch, thus giving me the flexibility to replace the CU and tails at my convenience (probably an evening or weekend). But how do I go about upgrading the main earth?
One example I've looked at is my mother's installation, which is an old type Wylex fuse board which she's wanted upgrading for some time. The installation is PME with 16mm meter tails and what looks like a 4mm or 6mm earth running from cutout to CU.
Obviously the tails need upgrading to 25mm with a CU change, and the main earth to 16mm.
What I'd assumed before I actually looked at the installation was that I'd get the supplier to fit an isolating switch, thus giving me the flexibility to replace the CU and tails at my convenience (probably an evening or weekend). But how do I go about upgrading the main earth?