I have an existing alcove shower which is in need of re-tiling. It's been in for 30 years and I have patched it up a few times with matching tiles. The walls are breeze block. I will probably need to strip the plaster. it's nor very big 740mm between the tiles at the moment. Can someone tell me the best way to prep the walls and retile it and the best materials to use please.