Hi Guys
Over the last two weeks I have been extending the tiling in my bathroom which was previously only part tiled and I had loads of tiles left over from when we had it done.
The tiles are normal ceramic ones and I have used unibond tile and grout
The room itself is an old outhouse with 3 external walls so very cold.
I have been tiling onto the wooden boxing which covers the pipework (mix of cementboard, chipboard and ply) and all wood is covered in emulsion.
The problem is that after 7 days the adhesive has not set. The tiles can be easily pulled off and the adhesive is still soft.
Ideas?
Ta
Over the last two weeks I have been extending the tiling in my bathroom which was previously only part tiled and I had loads of tiles left over from when we had it done.
The tiles are normal ceramic ones and I have used unibond tile and grout
The room itself is an old outhouse with 3 external walls so very cold.
I have been tiling onto the wooden boxing which covers the pipework (mix of cementboard, chipboard and ply) and all wood is covered in emulsion.
The problem is that after 7 days the adhesive has not set. The tiles can be easily pulled off and the adhesive is still soft.
Ideas?
Ta