i have currently tiled the bathroom floor laying down ply wood and screwing it down then layed the tiles and grouted(flexi grout and adhisive) everything is fine however now am thinking of tiling the kitchen floor which is wood T&G. I am concerned about tiling under the washing machine when the washing machine operates at hight spin wont this not affect the movement on the tiles i guess with a period of time the tiles will start to move. Is their a solution for this problem the floor is stable no movement what so ever however i dont want to be wasting my time tiling the floor and washing machine movement disturbing the tiles 6 months time.
Is their a solution to this problem or am i over reacting
Regards geoff
Is their a solution to this problem or am i over reacting
Regards geoff