I recently dug out some tree roots in an area of my garden that I wish to place a summerhouse in.
After I dug out a sizeable hole, I filled the area with soil and left my hose on it for 24hrs to waterlog the area and allow the soil to find a level.
Question - how long should I allow the soil to settle before placing a concrete base on it? Also, how deep should I allow a concrete base to be (for a summerhouse)?
Thanks in advance for info
After I dug out a sizeable hole, I filled the area with soil and left my hose on it for 24hrs to waterlog the area and allow the soil to find a level.
Question - how long should I allow the soil to settle before placing a concrete base on it? Also, how deep should I allow a concrete base to be (for a summerhouse)?