Hi all,
I've just taken over a new yard and it has a workshop, office etc.
The electrics are a mess, you've never seen anything like it! An example.
Stud wall through one stud a twin and earth which comes out the next stud, but we can't pull it through, we remove the board thats covering the studs and between the two studs is the twin and earth connected to a huge loop of 3 core with three connector blocks, mad thing is that if you removed the loop then there was enough twin and earth to join them together!
Anyhow
The office floor has underfloor heating with two tails appearing, they have the following on them.
Can anyone help with what I will need to get them working again.
EasyHeat Ltd.
Easy Cable 146m
2400w @ 240v
2200w @ 230v
the other
1200w @ 240v
1100w @ 230v
Thanks in advance.
I've just taken over a new yard and it has a workshop, office etc.
The electrics are a mess, you've never seen anything like it! An example.
Stud wall through one stud a twin and earth which comes out the next stud, but we can't pull it through, we remove the board thats covering the studs and between the two studs is the twin and earth connected to a huge loop of 3 core with three connector blocks, mad thing is that if you removed the loop then there was enough twin and earth to join them together!
Anyhow
The office floor has underfloor heating with two tails appearing, they have the following on them.
Can anyone help with what I will need to get them working again.
EasyHeat Ltd.
Easy Cable 146m
2400w @ 240v
2200w @ 230v
the other
1200w @ 240v
1100w @ 230v
Thanks in advance.