Hi all,

I was under the impression and indeed everywhere I have looked that under a block and beam floor a weed membrain is required along with a layer of hardcore or shingle etc. On my plans I have received it has a small note saying "50 concrete oversite" and pointing to the ground under the beams.

First of all what is concrete oversite and second of all is this needed on the ground below the floor rather than a membraini and some shingle/hardcore?

Thanks in advance
 
Sponsored Links
Hi all,

I was under the impression and indeed everywhere I have looked that under a block and beam floor a weed membrain is required along with a layer of hardcore or shingle etc. On my plans I have received it has a small note saying "50 concrete oversite" and pointing to the ground under the beams.

First of all what is concrete oversite and second of all is this needed on the ground below the floor rather than a membraini and some shingle/hardcore?

Thanks in advance

Oversite is just that: a layer of concrete laid over the site. Its probsbly best practice as it prevents weed growth and prevents rodents digging through.
However you can just do terram and hardcore. Ive seen jobs where the bare earth is left as is.

Make sure min 150mm air gap is left under beams.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top