Just quoting to fit a new CU but the main earth from the incoming supply is the armoured twisted & connected into the MET in the existing CU & there is also a piece of 6mm earth wire twisted in with the armour & also connected to the MET of the CU. Ze reading 0.15.
Somehow I think this needs improvement/upgrading but I'm not going to dabble with it.
Should I get the DNO to do something about it or would it be ok ?
Somehow I think this needs improvement/upgrading but I'm not going to dabble with it.
Should I get the DNO to do something about it or would it be ok ?