misses has asked that i wash up, i said an initial ok, as long as i can get the whole situation evaluated, the health and safety aspects sorted, then the risk assesment sheet finalised, then the method statement drawn up, and finally fitting the whole job in, should be available in 4 - 6 weeks love!

