I have a Siemens zone valve in use on a DHW cyl that is priority demand to a four pipe gas boiler the wiring is configured as follows;
When brown is live (240V) the aux switch creates a circuit between Grey and Orange.
On my boiler Gr and Or connects to the boiler's 24V DC terminal strip.
I am about to change boilers to a Viessmann 100-W and they advise I need a demand box.
Any reasons why?
Thanks
When brown is live (240V) the aux switch creates a circuit between Grey and Orange.
On my boiler Gr and Or connects to the boiler's 24V DC terminal strip.
I am about to change boilers to a Viessmann 100-W and they advise I need a demand box.
Any reasons why?
Thanks