Hi,
I've got a three storey house that needs central heating. I think zoning is the only sensible option, but not sure of the best way to do it.
I think I should have a manifold per floor (4 zones each) rather than having one big manifold - does this sound sensible (wanting to reduce the length of pipe runs)?
If I do it this way will I need three wiring / control centres? can they all be linked together?! Or can I still use just one? (Probably depends on the system?)
Does anyone have any suggestions on control systems (thanks for previous recommendations)
I've got a three storey house that needs central heating. I think zoning is the only sensible option, but not sure of the best way to do it.
I think I should have a manifold per floor (4 zones each) rather than having one big manifold - does this sound sensible (wanting to reduce the length of pipe runs)?
If I do it this way will I need three wiring / control centres? can they all be linked together?! Or can I still use just one? (Probably depends on the system?)
Does anyone have any suggestions on control systems (thanks for previous recommendations)