in my shower the bottom run of tiles has been letting in water from the first line of grout, i have removed the said tiles ( they more or lesss fell off as the water had blown the adhesive behind and left the plasterboard all wet and crumbling. do i just wait for it to dry out and re stick the tiles or would it be possible to cut out and replace the wet plasterboard?