Hi all
New to this and in need of some advice.
I'm currently looking at converting my flat as per the attached plans. I've got provisional OK from my building control company providing I use a sprinkler system to mitigate fire risk of creating inner rooms.
I now need to start looking at getting proper building regs plans drawn up. Do these need to be full plans? What level of detail is required? Any advice on getting this done and keeping cost down?
Thanks