I am replacing the rising main. I've got the MDPE up the drive to the outside wall, but how do I get indoors? It is a solid floor. I was going to come up the outside and then go in at floor level but someone said that I will disrupt the DPC and I will have a frozen pipe in winter. Do I really have to dig a two foot hole through my foundations? It sounds crazy