chrishutt said:Another example of BG incompetence. Any gas engineer worthy of the name should know that only reduced pressure at the meter is Transco responsibility.The BG guy measured at the boiler.
Not neccessarily chris, in the same way as the pressure at the meter is transcos the pressure before the appliance inlet is not anything to do with a BG contract.