What would be the order of installation for fixing a pedestal and basin?
ie. would one start by marking the holes and fixing the basin?
How would the order differ, if at all, when fixing two-taps or a mono-block?
On first fix would one set the supplies and waste to perfect centres and heights or would one set the waste to one side a little.