I recently bought a 3 bedroom leasehold maisonette. Upon purchasing I was aware it had a district heating system running through the service space between the two properties but I was not connected to it (when the system was installed in the mid 90's property owners were given the option of connecting or not, the previous owner of my property sadly declined).
When I enquired about connecting to this system I was told that I could but It would be best to wait as the system was being updated and it would be pointless upgrading now due to these changes. So the weeks passed and I kept getting told the leasehold company was in the process of discussing the upgrade. Finally after around 10 weeks I was told that the system was being upgraded however I would be unable to connect due to there being no provision in my lease for the leaseholders to supply me with any utilities and they would be unable to add it to my service charge.
I brought up the fact that the other privately owned properties had been connected to this system and I was informed that this should not have happened and it had been a big mistake as they hadn't realised this and they were going to have to rectify this error. I then suggested that they add this provision to my lease and I was told "that isn't a route we're willing to take".
Now I'm looking at a cost of around £4,000 to install an electric system. I was quoted £11,000 to have a gas pipe installed (there is a line at the bottom of my street 50 meters away) and I was unwilling to pay that much, not that it mattered as I was advised the leaseholders would not allow it due to my property being in a block. So I the only option I'm left with is an electric system which is expensive to install and to run whilst the pipes for the district heating system are in my property and literally ready to connect to. With all the pressure to reduce c02 emissions etc I thought they would have pressured me to connect to the system.
Any advice?
When I enquired about connecting to this system I was told that I could but It would be best to wait as the system was being updated and it would be pointless upgrading now due to these changes. So the weeks passed and I kept getting told the leasehold company was in the process of discussing the upgrade. Finally after around 10 weeks I was told that the system was being upgraded however I would be unable to connect due to there being no provision in my lease for the leaseholders to supply me with any utilities and they would be unable to add it to my service charge.
I brought up the fact that the other privately owned properties had been connected to this system and I was informed that this should not have happened and it had been a big mistake as they hadn't realised this and they were going to have to rectify this error. I then suggested that they add this provision to my lease and I was told "that isn't a route we're willing to take".
Now I'm looking at a cost of around £4,000 to install an electric system. I was quoted £11,000 to have a gas pipe installed (there is a line at the bottom of my street 50 meters away) and I was unwilling to pay that much, not that it mattered as I was advised the leaseholders would not allow it due to my property being in a block. So I the only option I'm left with is an electric system which is expensive to install and to run whilst the pipes for the district heating system are in my property and literally ready to connect to. With all the pressure to reduce c02 emissions etc I thought they would have pressured me to connect to the system.
Any advice?