Hi.
I am pouring concrete in strip foundations tomorrow and just wanted to clarify if it is best to vibrate it with a poker.
Some say yes and some no.
I would do it on an oversite slab or similar, but I'm unsure if it's needed in the foundations.
I am trench filling to around 750mm.
Thanks.
I am pouring concrete in strip foundations tomorrow and just wanted to clarify if it is best to vibrate it with a poker.
Some say yes and some no.
I would do it on an oversite slab or similar, but I'm unsure if it's needed in the foundations.
I am trench filling to around 750mm.
Thanks.
