Well...you'll need one purlin, which will probably be taking a lot less load than the ridge beam, as the ridge beam also has to support the new dormer roof.Been told I would be looking at
250x150 Purlins.
So I assume the Ridge would be a similar size, if not smaller.
And your span is 7.4m according to your sketch, so I would say that a 250x150 purlin would be woefully inadequate too. A 254x146 UB would be nearer the mark. Large sections I know, but you've got a huge roof. Now if you are planning to support the purlin and ridge beam somewhere near the middle, these sizes reduce massively. Then you need larger steels in the floor...
