I had a bit of land dug out and built a sleeper retaining wall with support beams every 2M. I will now be putting a 7ft fence on top, the posts will drop in the gap between the wall and soil. The post legs to where the fence starts will be slightly longer than the wall itself.
My question is will flooding the back of the wall with cement (and possibly rebar) be worth it, or should I just cement the posts in as normal and then back fill with soil?