Hi everyone, what is the smallest supply that would be supplied to a commercial property?
Basically a marina but want to add caravans, so trying to get an idea if we would have enough power supplied to the actual site in first place.
Power is provided by 3 phase and we are the only property connected to the 3 power lines suspended on the poles coming in.
Just wondering if there would be a minimum amount supplied by the grid ? as in 100kw? 200kw etc before our CU ?