Footing options for composite deck

Joined
11 Feb 2017
Messages
237
Reaction score
2
Country
United Kingdom
Hi all - Currently planning out my composite deck build, and am weighing up some footing options. It's not a high deck, with the joists not far above the ground and after watching various videos there seem to be so many more products and options around now. I haven't built a deck before, but I've done a lot of fencing, and was going to repeat the basic option of a post in a hole with some postcrete. It's been fine in the past, but does seem a little overkill for such a short post to go in, and I have a lot of holes to dig. My garden is also quite boggy and i know sometimes the postcrete clumps can end up moving about.

The other main options out there I would have clearance for seem to be:

- Ground screws such as here
- Cardboard tube former with concrete such as here (seems to be an american thing)
- A hole with a couple of concrete blocks and then an adjustable foot, either in plastic or metal (that does give me an extra degree of flexibility to level as I go). I think some call this a block bearer system.

I've got 15 holes to do overall. Would be interested to hear people's opinions of the best way to do this in 2022!
 
I did mine by digging down about 60cm, putting half a concrete block in the bottom, then the post and a bag of postmix. If there was any movement, when the frame was bolted onto it there wouldn't be anymore.

I took it all apart a few weeks back for an extension... I'd over engineered it, it appeared! Nightmare to remove....
 
I used a load of (free from Freecycle) 2 foot concrete slabs - great for load spreading on soft ground.
 
I used a load of (free from Freecycle) 2 foot concrete slabs - great for load spreading on soft ground.

Thanks - just bracketed some uprights off this? I've got loads of slabs to break up (unfortunately i cant use them where they are as their ground level is too high)
 
I used a load of (free from Freecycle) 2 foot concrete slabs - great for load spreading on soft ground.
I had slabs that were already laid so I just had short wooden legs going onto the slabs resting on a piece of dpc. Legs were soaked in preserver for a week
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top