Hi. First time on here, so excuse if in the wrong place! I recently installed decking, this requiring quite a degree of soil removing adjacent to the house. Anyway, having dug down pretty much to what appears to be the footings, (slight even lip of about 3 inches, several courses below damp course), my question is as follows. Do I have to back fill over the footings or can their top surface remain exposed? Weed membrane and the decking itself sits above currently. As I say, I am assuming this ledge to be the footings, although they are perhaps not more than a foot or so down. My hope is that, as cured concrete of 60 years plus, I can leave it exposed!