Question regarding installing a stone resin shower tray on a bed of cement mix. Never had one done before so apologies on this. The tray has been fitted , it’s all level but should the tray be able to be lifted back off the cement bed or should it be bonded to the bed (tray was fitted 3 days ago) if it should be bonded to the cement what would cause it not to bond? The sand /cement ratio mix was 5 to 1 as instructed.
Thanks
Question regarding installing a stone resin shower tray on a bed of cement mix. Never had one done before so apologies on this. The tray has been fitted , it’s all level but should the tray be able to be lifted back off the cement bed or should it be bonded to the bed (tray was fitted 3 days ago) if it should be bonded to the cement what would cause it not to bond? The sand /cement ratio mix was 5 to 1 as instructed.