Hey,
Just joined the forum for some advice troops.
Just had an electrician round to look at putting in 4 storage heaters in my flat. I must admit I want this done in cheapest way possible. I dont have a meter with e7 and realise I would need the leccy board to fit this. Is it possible for the spark to just run a radial or ring round 4 switched spurs, through a time-clock and with a suitable dircuit breaker in my main board? I realise I would not benefit from the cheaper rate of e7 for this, but thats not my main concern at the moment. The spark in question said no contractor could sign that off and could only be done through a 'homer'. Though he never quite offered his services!
Any advice would be great, cheers.
T
Just joined the forum for some advice troops.
Just had an electrician round to look at putting in 4 storage heaters in my flat. I must admit I want this done in cheapest way possible. I dont have a meter with e7 and realise I would need the leccy board to fit this. Is it possible for the spark to just run a radial or ring round 4 switched spurs, through a time-clock and with a suitable dircuit breaker in my main board? I realise I would not benefit from the cheaper rate of e7 for this, but thats not my main concern at the moment. The spark in question said no contractor could sign that off and could only be done through a 'homer'. Though he never quite offered his services!
Any advice would be great, cheers.
T
